61 results in English
Isabel, Brazilian Princess
The Thereza Christina Maria Collection consists of 21,742 photographs assembled by Emperor Pedro II and left by him to the National Library of Brazil. The collection covers a vast range of subjects. It documents the achievements of Brazil and the Brazilian people in the 19th century, as well as includes many photographs from Europe, Africa, and North America. This photograph shows Princess Isabel, the daughter of Pedro II and, until the abolition of the monarchy in 1889, the heir to the Brazilian throne. It was taken by Joaquim José ...
Paranaguá
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Porto de Don Pedro II Station, Kilometer 2200
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Alexandra Station, Kilometer 15
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Morretes Station, Kilometer 40.900
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Bridge over River Ribeirão, Kilometer 14.053. 2 Spans of 20 Meters
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Bom Jardim River Bridge, Kilometer 48.660. 1 Span of 30 Meters
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Volta Grande Embankment, Kilometer 50
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paraná Province. Sanga Funda Tunnel, Kilometer 53.607
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Kilometer 58.609, Marumbí Hill
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Boa Vista Tunnel, Kilometer 58.299
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Araucaria angustifolia, a Paraná or Brazilian Pine
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paraná Railway
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Map of the Battle of Catalan: Dated the 4th of January in 1817
This hand-colored manuscript map depicts the Battle of Catalan, January 4, 1817, in which the Portuguese Army, operating from southern Brazil, defeated forces led by José Gervasio Artigas, the leader in the struggle for Uruguayan independence. Portugal was tacitly allied with the government in Buenos Aires, which was seeking to retain its grip on the eastern province of Argentina that would become the independent country of Uruguay.
Itamaraty Waterfall
The Thereza Christina Maria collection is composed of 21,742 photos assembled by Emperor Pedro II (1825-91) throughout his life and donated by him to the National Library of Brazil. The collection covers a wide variety of subjects. It documents the achievements of Brazil and Brazilians in the 19th century and also includes many photographs of Europe, Africa, and North America. This photograph shows the Cascata do Itamaraty (Itamaraty Waterfall) on the Piabanha River near Petrópolis. The waterfall still exists, but is known today as the Cascata de Bulhões. Most ...
Paranaguá to Curitiba Railway. Paraná Province: Taquaral Viaduct, Kilometer 60.284. 4 Spans
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Tunnel, Kilometer 63.282, Exit
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Rochedo Tunnel, Kilometer 60.614
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Viaduct, Kilometer 61.721. 3 Spans of 20 Meters, 12 Meters, and 20 Meters
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Viaduct, Kilometer 61.721. 1 Span of 25 Meters
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Viaduct, Kilometer 62.640
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Viaduct over the River São João, Kilometer 62.210. 4 Spans of 12 Meters, 16 Meters, 32 Meters, 70 Meters, and 12 Meters. 55 Meters in Height
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Overview of the Viaducts, Kilometer 63
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Viaduct, Kilometer 63.217. 2 Spans of 16 Meters
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Overview of the Railway, Taken from Kilometer 63
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
National Exposition 1866: Throne Room
The Thereza Christina Maria collection is composed of 21,742 photos assembled by Emperor Pedro II (1825-91) throughout his life and donated by him to the National Library of Brazil. The collection covers a wide variety of subjects. It documents the achievements of Brazil and Brazilians in the 19th century and also includes many photographs of Europe, Africa, and North America. In 1866, Rio de Janeiro hosted the National Exposition, which took place in a palace that today houses the National Archives. The Exposition was visited by 52,824 persons ...
National Exposition 1866: Agricultural Products
The Thereza Christina Maria collection is composed of 21,742 photos assembled by Emperor Pedro II (1825-91) throughout his life and donated by him to the National Library of Brazil. The collection covers a wide variety of subjects. It documents the achievements of Brazil and Brazilians in the 19th century and also includes many photographs of Europe, Africa, and North America. In 1866, Rio de Janeiro hosted the National Exposition, which took place in a palace that today houses the National Archives. The Exposition was visited by 52,824 persons ...
Paranaguá to Curitiba Railway. Paraná Province: Conselheiro Sinimbu Viaduct, Kilometer 64.292. 3 Spans of 20 Meters
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Tunnel Number 1 of Pico do Diabo
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Tunnel Number 1 of Pico do Diabo, Kilometer 64.901, Exit
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Trench, Kilometer 63.900
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Tunnel Number 2 of Pico do Diabo, Kilometer 63.029
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Overview at the Entrance of the Ipiranga Valley, Kilometer 66.511
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Viaduct Number 3 of Ipiranga River, Kilometer 72.089. 1 Span of 30 Meters
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Piraquara Station, Kilometer 87.350
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Paranaguá to Curitiba Railway. Paraná Province: Curitiba Station
The Paranaguá to Curitiba line of the Paraná Railway in Brazil was constructed between 1880 and 1884. The work was divided into three parts: Paranaguá−Morretes, Morretes−Roça Nova, and Roça Nova−Curitiba. The construction team was headed by the engineer João Teixeira Soares. The construction marked a milestone in Brazilian engineering, as it involved crossing the coastal Serra do Mar. A British writer gave this description of the line in 1917: “The summit is reached at 3122 feet [952 meters] after a 40-km. rise…. The track of 1-metre gauge ...
Rio de Janeiro: a View
The Thereza Christina Maria collection is composed of 21,742 photos assembled by Emperor Pedro II (1825-91) throughout his life and donated by him to the National Library of Brazil. The collection covers a wide variety of subjects. It documents the achievements of Brazil and Brazilians in the 19th century and also includes many photographs of Europe, Africa, and North America. In 1862, the government of Spain under Queen Isabella II sent a team of naturalists to South America to collect objects for Spanish museums. The endeavor was known as ...
Sugar Loaf
The Thereza Christina Maria collection is composed of 21,742 photos assembled by Emperor Pedro II (1825-91) throughout his life and donated by him to the National Library of Brazil. The collection covers a wide variety of subjects. It documents the achievements of Brazil and Brazilians in the 19th century and also includes many photographs of Europe, Africa, and North America. In 1862, the government of Spain under Queen Isabella II sent a team of naturalists to South America to collect objects for Spanish museums. The endeavor was known as ...
Dom Pedro I Square
The Thereza Christina Maria collection is composed of 21,742 photos assembled by Emperor Pedro II (1825-91) throughout his life and donated by him to the National Library of Brazil. The collection covers a wide variety of subjects. It documents the achievements of Brazil and Brazilians in the 19th century and also includes many photographs of Europe, Africa, and North America. This statue, erected in 1862, was the first civic monument in Rio de Janeiro. The sculpture features Emperor Pedro I on horseback. Around the base are four figures in ...